Texas Instruments INA826S Amplfier Evaluation Module (EVM)
Texas Instruments INA826S Amplifier Evaluation Module (EVM) is a platform for the basic functional evaluation of the INA826S. The Texas Instruments INA826S amplifier is a low-cost instrumentation amplifier that offers extremely low-power consumption along with shutdown and operates over a very wide single or dual-supply range. All of the most common instrumentation amplifier configurations are supported.Features
- The shutdown function is fully configurable
- Extra footprints are provided for an optional buffer, gain, and filter components
- Supports buffered reference
- Supports single and dual supplies
Board Layout
Publicado: 2017-08-04
| Actualizado: 2022-06-15
